
Final Project: Wondermaker: 'Animate' + Rebuild
For this final project, we are required to design and build the interior from the given site; The ROW. Design conceptual is requisite to...
Building Science Project
https://drive.google.com/drive/folders/1iBhYAKETOxbIMNrUFvPv-qTJb3eUzvln

PROJECT 2: Post-APOCALYPTIC Entity
For this project, we are to dwell in our thoughts and come up with a narration of the cause of the apocalypse and the location of where...


PHASE 2: TRANSFORMATION
The picture shown below is the time that we were having our first meeting for the phase 2 of transformation. This meeting is on May 3...


PROJECT 1B: PRECEDENT STUDIES TO SUBJECT MATTERS
For this project, we are required to come out with an interest and obsession and subject matter that we are able to project it visually...


PHASE 1_PLANNING: PROPOSAL + BUDGET
GROUP PROPOSAL For this assignment, we are going to Enhance the interior of reading space at Ulu Melaka Orang Asli Village, Serendah,...
PROJECT 1: PROXIMITY, FIXATION+ DISCOVERY
For this project, we are asked to visit to a site named "THE ROW" in group. There are 5 groups in total which are: Group 1: Physical...

PROJECT 2: Exterior and Interior Rendering
WORK IN PROGRESS Using the same model from Project 1, we are required to add in materials, lights, cameras and site context for final...

PROJECT : Revit modelling & Documentation
The building that I choose for this project is SS3 House which is located in Malaysia and it is designed by Saranya Panchaseelan. This...


PROJECT 3 & OVERALL
For final project, we are required to build two containers for our architects to have activities in it. Based on the site we visited to...